
A socket outside, done properly
IP55 or better, checked before we fit.
Read moreWe answer every enquiry by email. Send your postcode and what you have in mind.
Plug-in Solar West Mids / Telling the operator
A panel that's been fitted has to be reported to National Grid Electricity Distribution inside 28 days. We don't leave that to you; it gets done during the visit.
National Grid Electricity Distribution (West Midlands) plc runs the wires under Birmingham, Coventry, Wolverhampton and the Black Country, one of fourteen distribution licence areas across Great Britain. Ours is a working answer rather than a certainty, so the postcode gets a second check against the operator's own tool before anything leaves us.
A phone call skips the checking altogether. Dial 105 from a landline or mobile anywhere in England, Scotland or Wales and the call routes itself to whichever firm owns the cables at that address, no postcode lookup needed on our part or yours.
Older paperwork sometimes still names Western Power Distribution. The company took its current name, National Grid Electricity Distribution, in 2022, and the network behind it has not changed.
The government's own impact assessment describes it as a short online form, five to ten minutes, completed within 28 days of the panel going in, asking for a name, an email address and the address it was installed at.
We treat that as the process the guidance describes rather than a deadline with a penalty attached, since that is how the assessment itself frames it. We go through it with you on the visit rather than leaving it for later.
Left to the product rules alone, a house could carry one device per final ring circuit and more than one overall. The network side closes that gap: Engineering Recommendation G98 Issue 2 Amendment 1, put forward by the Energy Networks Association in April 2026 and signed off by Ofgem that August, holds every household to a single device.

It is not only a condition of the framework. Where an export tariff is on offer, getting paid for it depends on the device being registered with the operator first, so there is a reason to do it beyond the rule itself.
No. The framework treats registration as something that happens after fitting, not an application beforehand. That is different from how a full rooftop system works.
What is registered is the installation address, not the person. Taking the device with you means registering it again at the new address.
No, and this site only covers Birmingham, Coventry, Wolverhampton and the Black Country, all inside England. If your postcode is over the border, say so on the form and we will point you to the right information rather than guess.
Send your postcode and tell us what the surface is. We reply by email.
Send my postcodeA postcode and a line about the job is enough. We'll email you back.
We need a name, an email and a postcode, and it helps to know if a kit has been bought and where it's meant to go. The reply comes by email with what the rules say about that spot.
We reply by email and keep your details to ourselves.